August Construction Update - The Parkview Residences at Southlake Town Square

As we near the end of construction, all the fine-tuning is underway.

Multicolor tile has been set along the perimeter walls of the main lobby, and crews are prepping the center of the lobby for installation of the special inlaid wood that will create a stunning entrance experience. Separate ornate flooring for the elevator lobby to distinguish it from the main lobby is being set today. The artisan laser cut backdrop panel that will serve as a focal point for the elevator lobby is in production, and will be installed and backlit once all the flooring is in place.

The Conference Room has 75% of its flooring installed, which will be completed by the end of this weekend. Crews will then move across the lobby to the Club Room and start installing flooring in this special space. Appliances and final cabinet lighting for the Club Room kitchen will be installed shortly.

We are all set to hang mirrors in the Fitness Center and Yoga Room, which will complete these two communal spaces. We have installed special coded locks on these rooms to ensure safe use and allow owners to access Parkview’s amenity areas without having to bring their key fob.

Our rooftop pools have been plastered and filled with water. Adjustments are being made to all the pumps and filters to ensure the pools operate properly.

Finally, architect punch on the second and third floors has been completed. As we move up to the fourth floor, we are redirecting our manpower to complete punch list items so we can speed up completion of the Residences. We have continued to supply the city with requested items, and are working with the Fire Marshal to clear some items brought to our attention. Final inspections are continuing on the TCO floors.

Interested in purchasing a home at The Parkview Residences? Contact us today for more information on pricing and availability.

Schedule a Tour