We are pleased to share an update on interior finishes at The Parkview Residences.

FLOORING
We have started laying flooring in the hallways of Level 2, and Level 3 will begin shortly. Flooring in the Level 2 amenity areas will begin once the hallway flooring is complete to ensure flawless alignment and a seamless transition into each room.

LIGHTING
Much of the decorative interior lighting is now being placed, while outside lighting on the rooftop deck is nearly finished. We have installed sconces at the unit entries through our lower floors, and are working our way up the building. Lighting and ceiling fans have been installed in the Fitness Center as well, adding visual interest to this stunning communal space.

ROOFTOP DECK
Our rooftop plunge pools have been tested and the re-tile is finished. The pedestal paver system is almost complete, at which time we will install the planter boxes.

ENTRANCE
Special stone pavers for Parkview’s entryway have been placed at the transition areas and the lobby. These special pavers will marry the outside pavers to our entrance area, giving us a sense of arrival as we enter the building.

PARKING
Our contractor has started final paint in the parking structures. All insulation and ceilings in this area have been installed, and reglets for the parking garage entry walls are being placed to finish the design intent of this area.

We are pleased with our continued progress and look forward to presenting these beautiful finishes to our owners. Our care and attention to detail will result in a building that is a source of pride for us all.