We are very pleased with construction progress since our last update.

We are installing steel railings on balconies at the front of the building, as well as corner balconies on the north and south, and are completing waterproofing on the undersides of the balconies.

Portico steel has been erected at the front lobby entrance, and will continue to morph.

Construction continues on the private Penthouse and pool wing walls, and pool structures are being water tested. We are connecting rooftop mechanical equipment to the system’s control features to get ready for testing.

Floors 2 through 4 are rocked, taped, and bedded, with the first coat of paint complete. Cabinets are being set on the second floor and tile to the bathroom walls and floors is well underway.

Temporary hallway lighting and doors have been installed to comply with Southlake inspection review. The exhaust fans in the north parking garage have been installed and tested as well.

All traction elevators are now complete and installed, with the freight elevator loading construction supplies to the building.

 

 