A special detail group has come in from Arizona this past week to finish the ceilings in the lobby.  We have gone the extra mile to insure a quality arrival, and the people from Hopper Finishes have done a great job hand troweling the plaster ceilings in the lobby area, conference room, and Club Room.

 


 

Mirrors have been hung in the Fitness Center and Yoga room, and the measurements are being taken to frame the mirrors and finish these spaces.

 


 

The lobby continues to evolve as special lighting is installed on the walls and ceiling, including special sconces and art lights. The cased openings have subtle, flush uplights that highlight the wood casing at each of the lobby entry points as well. Period glass pendent lights are being placed above the Conference Room table this coming week, along with a special chandelier in the Club Room. All lobby door casings, doors, and baseboards have been stained a rich mahogany colour.

We are about to install frames on the mirrors we mentioned last week, which will allow the delivery of the Fitness Center equipment.

Just down the hall outside the elevator lobbies on floors 2 – 4, we have hung unique branch-like chandeliers in the mid-section of the hallways.

 

 

Finally, the elevator annunciator panel has arrived at the site and is being installed by the elevator technicians. This should be ready for testing on Monday, and is the final item outstanding to start all the inspections to pass city muster for TCO.